Competent, economical, on schedule – As one of the most efficient and competitive railway infrastructure companies, the SPITZKE Group carries out new build and repair work on railway systems of all line categories, railway stations and railway bridges. The SPITZKE range of services is completed by our own production expertise. We produce and supply, among other things, track and turnout sleepers made of prestressed concrete and spun concrete masts, steel masts including accessories, safeguardings for railway and road bridges as well as buffer stops for track ends. Around 2,000 competent employees in Germany and elsewhere in Europe are committed to this portfolio and successfully fulfil even the most demanding customer wishes.

Our projects

Project

High-speed rail line 4080, Germany

The high-speed rail line 4080 between Mannheim and Stuttgart was opened on May 31, 1991. Today around 24 million passengers p. a. use this connection with the long-distance trains operated by Deutsche Bahn AG. From April to October 2020, the railway infrastructure company SPITZKE is revitalizing the 99 km long railway track under complete closure. The experts from our areas of expertise track, technology, logistics and equipment/​electrical engineering are on duty. Learn more about the latest work in progress in our project ticker.

Project

Electrification Südbahn, Germany

Since August 2018, the employees of our Equipment/​Electrical Engineering division electrify the “Südbahn” in several lots. On the oldest railway line in Baden-Wuerttemberg, more than 2,000 masts are built by our foundation experts, most of them from SPITZKE’s own production subsidiary SPITZKE FAHRWEGSYSTEME GmbH. Already in November 2018, the first finished catenary length could be celebrated. Learn more about our latest electrification work in progress in our project ticker.

Project

West coast line, Germany

On behalf of the energy network operator Tennet TSO, SPITZKE built the foundations for 60 of the 130 masts in the third construction phase of the new 380 kV route between Heide / West and Husum from November 2018 to July 2020. As soon as the west coast line is in operation, it will direct the wind power generated on the coast to the south of Germany. To carry out the work, we relied on our founding experts for overhead lines located in our branch Leer.

Project

Bündel Höllental West, Germany

On the Höllentalbahn, Germany’s steepest main line (a gradient of more than 57 per thousand), our track experts renewed tracks, points, sleepers and foundation and placed new geosynthetics and FPL in April and May 2018. The work on the single-track steep section required special approvals and safety precautions for all machines and equipment used on the steep section as well as specially trained personnel.

Project

Large-scale-project: Berlin Ostkreuz, Germany

Since 2011 SPITZKE SE, as lead partner of ARGE Berlin-Ostkreuz VP 11, has contributed to the conversion of the busiest interchange in Berlin’s public transport network. The project covered the entire range of service of the railway infrastructure, from track, equipment/​electrical engineering, buried cabling works and structural engineering to the construction of a new railway platform. In December 2018, the project has been completed.

Project

Large-scale-projects with 4D planning and surveying, Denmark

SPITZKE SE Danmark realized two projects in cooperation with the ARGE partner Aarsleff Rail A / S in the greater Copenhagen area. In the summer of 2017, our specialists renewed the Kystbanen tracks and the S-Bahn line between Valby and Svanemøllen in Denmark. The specialists on site were supported by SPITZKE track-laying machinery, welding, surveying and alignment, and logistics.

Project

High-speed rail line 4080, Germany

The high-speed rail line 4080 between Mannheim and Stuttgart was opened on May 31, 1991. Today around 24 million passengers p. a. use this connection with the long-distance trains operated by Deutsche Bahn AG. From April to October 2020, the railway infrastructure company SPITZKE is revitalizing the 99 km long railway track under complete closure. The experts from our areas of expertise track, technology, logistics and equipment/​electrical engineering are on duty. Learn more about the latest work in progress in our project ticker.

Project

Electrification Südbahn, Germany

Since August 2018, the employees of our Equipment/​Electrical Engineering division electrify the “Südbahn” in several lots. On the oldest railway line in Baden-Wuerttemberg, more than 2,000 masts are built by our foundation experts, most of them from SPITZKE’s own production subsidiary SPITZKE FAHRWEGSYSTEME GmbH. Already in November 2018, the first finished catenary length could be celebrated. Learn more about our latest electrification work in progress in our project ticker.

Project

West coast line, Germany

On behalf of the energy network operator Tennet TSO, SPITZKE built the foundations for 60 of the 130 masts in the third construction phase of the new 380 kV route between Heide / West and Husum from November 2018 to July 2020. As soon as the west coast line is in operation, it will direct the wind power generated on the coast to the south of Germany. To carry out the work, we relied on our founding experts for overhead lines located in our branch Leer.

Project

Bündel Höllental West, Germany

On the Höllentalbahn, Germany’s steepest main line (a gradient of more than 57 per thousand), our track experts renewed tracks, points, sleepers and foundation and placed new geosynthetics and FPL in April and May 2018. The work on the single-track steep section required special approvals and safety precautions for all machines and equipment used on the steep section as well as specially trained personnel.

Project

Large-scale-project: Berlin Ostkreuz, Germany

Since 2011 SPITZKE SE, as lead partner of ARGE Berlin-Ostkreuz VP 11, has contributed to the conversion of the busiest interchange in Berlin’s public transport network. The project covered the entire range of service of the railway infrastructure, from track, equipment/​electrical engineering, buried cabling works and structural engineering to the construction of a new railway platform. In December 2018, the project has been completed.

Project

Large-scale-projects with 4D planning and surveying, Denmark

SPITZKE SE Danmark realized two projects in cooperation with the ARGE partner Aarsleff Rail A / S in the greater Copenhagen area. In the summer of 2017, our specialists renewed the Kystbanen tracks and the S-Bahn line between Valby and Svanemøllen in Denmark. The specialists on site were supported by SPITZKE track-laying machinery, welding, surveying and alignment, and logistics.

SPITZKE in figures

Our vision

Creating connected dimensions.

We like to accept new and unusual tasks. Solving these is our continuous goal. We create connections for our customers every day, with our employees and within the Group. To do this, we make our decisions quickly and decisively on the basis of our many years of experience and our specific technical knowledge in the railway sector.

Competently, passionately, and always forward-looking.

Milestone

Our history and successes

Winner of the DB Supplier Award 2018

During the international trade fair for transport technology InnoTrans 2018 we have been awarded with the “DB Supplier Award” in the category infrastructure. With this award Deutsche Bahn honors highly capable and committed suppliers who have established themselves in their market segment and fulfill their contractual obligations in an exemplary manner.

Winner of the DB Supplier Award 2018

During the international trade fair for transport technology InnoTrans 2018 we have been awarded with the “DB Supplier Award” in the category infrastructure. With this award Deutsche Bahn honors highly capable and committed suppliers who have established themselves in their market segment and fulfill their contractual obligations in an exemplary manner.